Phase | Design |
Construction timing | Construction is currently expected to take place from August to September 2022 |
Activity | Erosion protection |
Overview | Rock groynes (walls built out from a riverbank into a river) will be built in this area to help protect the riverbank from erosion. |
Get in touch
- Phone:
- 0800 496 734
- Email:
- info@gw.govt.nz