Phase | Project complete |
Activity | Erosion protection |
Construction timing | Construction took place from May to July 2022 |
Overview | Rock groynes (walls built out from a riverbank into a river) were built in this area to help protect the riverbank from erosion. |
Get in touch
- Phone:
- 0800 496 734
- Email:
- info@gw.govt.nz