The Thorndon Quay Hutt Road (TQHR) project, whilst primarily concerned with Thorndon Quay and Hutt Road, includes work in three main areas that are covered in the Single Stage Business Case (SSBC), all at different stages of development.  These areas are:

  • The Thorndon Quay and Hutt Road corridor
  • The ‘Connection’ between Hutt Road and Te Ara Tupua (Petone to Ngauranga) shared path
  • Aotea Quay intersections

This SSBC presents the case for change, including the option development and assessment process that was applied to identify a preferred option.  It also presents the cost estimation and economic appraisal for this option which is being considered by Council on 24 February 2022 (see Report 21.606). 

Appendix B - Existing Traffic Flows (PDF 1.2 MB)

Appendix C - Analysis of Bus Operating Performance (PDF 1.1 MB)

Appendix D - Safe System Framework Assessment (PDF 1 MB)

Appendix E - Summary of Evaluation of Corridor Treatment Long List Options (PDF 1.1 MB)

Appendix F - Summary of Evaluation of Node and intersection Treatment Long List (PDF 1 MB)

Appendix G - Bus Stop Rationalisation (PDF 1.4 MB)

Appendix H - Alternative and Options Report (PDF 11 MB)

Appendix I - 2021 Stakeholder and Public Engagement (PDF 1.4 MB)

Appendix J - Preliminary Design Philosophy Statement (PDF 42 MB)

Appendix K - Modelling and Analysis (PDF 4.6 MB)

Appendix L - Economic Evaluation Approach and Assumptions (PDF 1.3 MB)

Appendix M - Cost Estimates (PDF 1.3 MB)