TN18 WTSM Calibration and Validation
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
alarm Published 31 Dec 2013 -
TN1 Network Preparation FINAL
This technical note (TN) outlines the procedure used in preparing the networks for the 2011 Wellington Transportation Strategic Model (WTSM) update and the Wellington Public Transport Model (WPTM). Unlike the…
alarm Published 31 Dec 2013 -
TN17 Validation Guidelines and Criteria - WTSM and WPTM
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
alarm Published 31 Dec 2013 -
TN24 Baseline Forecasting Report
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
alarm Published 31 Dec 2013 -
TN23 Future Year Base Networks and Services
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
alarm Published 31 Dec 2013 -
TN15 Input Parameters
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
alarm Published 31 Dec 2013 -
TN22 WPTM Sensitivity Testing
The Wellington Transport Strategy Model (WTSM) and the Wellington Public Transport Model (WPTM) are the modelling tools that have been updated / developed for Greater Wellington Regional Council (GWRC). The…
alarm Published 31 Dec 2013 -
TN00_C3079 Model Development Report
The GWRC carry out a core transportation planning and land-use function within the Wellington Region and the use of transportation modelling tools and projections is a mechanism to assist with strategic…
alarm Published 31 Dec 2013 -
Correspondence from December 2012
This document outlines correspondence between applicant and GWRC regarding resource consent WGN130085 [31970].
alarm Published 26 Dec 2012 -
Correspondence from November 2012 to January 2013
This document outlines correspondence between applicant and GWRC regarding resource consent WGN130085 [31970].
alarm Published 17 Dec 2012