-
TE KĀURU UPPER RUAMĀHANGA PROPOSED FLOODPLAIN MANAGEMENT PLAN - SUMMARY FOR PUBLIC CONSULTATION
A floodplain management plan is a document that describes the approach to flood and river management over the next 30-40 years. It describes various types of responses that will be…
alarm Published 01 Mar 2019 -
Appendix B: Freshwater Fish Passage Requirements
This document contains the assessment of fish passage requirements in the project area to aid in the resource consent application.
alarm Published 01 Mar 2019 -
-
Appendix 8: Technical Review
This document contains the technical review of the Featherston Wastewater Treatment Plant consent application (WAR170229), which considers the proposed land discharge of treated wastewater to land and the associated assessment…
alarm Published 27 Feb 2019 -
Appendix F: Consent Level Beach Nourishment Design and Effects Assessment
This document contains the consent level design for the proposed beach nourishment that forms part of the shared path project. This is proposed as a strategy to mitigate the loss…
alarm Published 25 Feb 2019 -
-
-
-
Appendix 5: Relevant Statutory Criteria Sections 5-108
This document contains the relevant statutory criteria within the Resource Management Act 1991 under Sections 5-108.
alarm Published 21 Feb 2019 -
Appendix 4: Summary of Submissions
This document contains the summary of submissions that relate to the consent WAR170229.
alarm Published 21 Feb 2019