-
Follow-up to Hearing Panel #7
This document contains the letter stating a clarification for several points raised at the seventh Hearing Panel Meeting.
alarm Published 19 May 2019 -
-
Hearing Panel #7 Minutes
This document contains the seventh minutes of the hearing procedures and the commissioners directions.
alarm Published 17 May 2019 -
-
Comments on Construction Methodology Requirements
This document contains a letter regarding the construction methodology of issues raised in the Eastern Bays Shared Path project reviews from Megan Oliver and Shannon Watson (GWRC).
alarm Published 16 May 2019 -
-
-
Review of Eastern Bays Shared Path Assessment of Alternatives and Design Features
This document contains a review of the alternatives and design features relating to the Eastern Bays Shared Path project.
alarm Published 15 May 2019 -
Review of Eastern Bays Shared Path Recreation Assessment
This document contains the peer review of the Assessment of Recreation Effects associated with the proposed Eastern Bays Shared Path.
alarm Published 15 May 2019