Appendix 3: South Wairarapa Integrated Wastewater Scheme - Technical Review

Search in document library
Appendix 3: South Wairarapa Integrated Wastewater Scheme - Technical Review preview
  • Published Date Tue 13 Aug 2013
All Tags

This document contains the technical review which evaluates the following four options:

  • Combined land disposal scheme with and without the inclusion of Carterton District Council’s (CDC) WWTP effluent;
  • Separate land disposal schemes for each site;
  • Combined high rate treatment plant and discharge to water; and 
  • Separate high rate treatment plants for each site and discharges to water.
Updated April 4, 2022 at 12:07 PM