Requested Information:

  • I really would like to see a schematic of how this proposed facility (the Pakuratahi Lakes) is laid out and how it connects to existing pipes. I suspect that the outlet from the proposed lakes would have to cross the fault, possibly in a tunnel, which would be a challenging repair project after fault rupture.
  • When Greater Wellington submitted this project to the Government’s Infrastructure Priorities Programme there must have been some documentation and details supporting the submission. I would like to have a copy of the executive summary of this submission.