| The Hutt Corridor follows State Highway 2 and the Wairarapa railway line from Ngauranga through to Upper Hutt. The Hutt Corridor Plan was adopted in December 2003, following a consultative process. It includes connections to adjacent corridors. The plan includes a number of improvements for road, rail, walking and cycling. The Hutt Corridor Plan as adopted in December 2003 can be viewed by clicking on the pdf on the right hand side of the screen. The Hutt Corridor Plan was reprinted alongside the Regional Land Transport Strategy in August 2007 in an updated format. Background reports to the Hutt Corridor Plan |