Wellington Public Transport Spine Study
http://www.gw.govt.nz/ptspinestudy
The Wellington Public Transport Spine Study, a key action from the Ngauranga to Airport Corridor Plan, was undertaken to help determine a future public transport solution for Wellington City – one that is high quality, modern and meets the longer term aspirations and demands of our city and region.
The Public Transport Spine Study (PTSS) is now complete and the full study reports are available below.
A high quality public transport spine for Wellington: Dominion Post advertorial 5 March 2014
People were invited to give their feedback on the options between July - September 2013. Public submissions, along with responses from two citizens' engagement panels, were analysed and results were reported to a Hearings Subcommittee in late November / early December.
The findings of the hearings subcommittee informed the Regional Transport Committee's decision, on 4 March 2014, to take Bus Rapid Transit forward for implementation.
Hearings subcommittee report and recommendations Feb 2014
Please note: Some of these files are very large so may take time to download.
Presentation to stakeholders and interest groups August 2013 (PDF, 1.65MB)
Alternative Funding Options Study
Appendices
Appendix B - Short List Cross Sections
Appendix C - Planning Assessment
Appendix D - Economic Evaluation
Appendix E - Option Cost Methodology
Appendix F - Public Transport Service Cost Methodology
Other documents
Technical Note - Secondary Routes through CBD
Shared light rail and SH1 road tunnel - Q&As
Modelling
Appendix for Chapter 7 - WTM Highway Capacities
Appendix for Chapter 8 - Coding of Interchanges for PTSS
Appendix 1 for Chapter 9 - Additional Model Results
Appendix 2 for Chapter 9 - PT Indicators
Appendix 3 for Chapter 9 -WTM Highway Indicators
Appendix for Chapter 10 - PT Time Benefits
Peer review
These reports document progress on the public transport spine study. They are interim reports, the work within which was refined as the study progresses.
Milestone 1:
Engagement Report
Main report (536KB)
Appendices A - E (1.6MB)
Appendices F - H (1.4MB)
Inception and Scoping Report
Main report (937KB)
Appendices (2.6MB)
Milestone 2: International Review
Main report (829KB)
Appendices A (Glossary), B (Summary of responses to case study questions), D (References) (538KB)
Appendix C / 1 - Case Studies (4.3MB)
Appendix C / 2 - Case Studies (6.3MB)
Milestone 3: Long list option evaluation
Main report (1.1MB)
Appendix B - Catchment area analysis (2MB)
Appendix C - Modelling analysis (0.5MB)
Appendix D - Recommended option alignment by mode (1.9MB)
Appendix A is an enormous file, containing large scale representations of the area route alignments in the main report.
Please email us (details below) if you have any queries about this.
Milestone 4: Medium list option evaluation
If you have a query regarding the Wellington Public Transport Spine Study, you can:
Email us or
Phone 04 384 5708
Any queries for the study consultant should be directed to Greater Wellington in the first instance.