Skip to content

Pinehaven Stream

http://www.gw.govt.nz/pinehavenstream

Pinehaven Stream

Updated 20 August 2019 12:56pm

The Pinehaven Stream is jointly administered by Greater Wellington Regional Council and Upper Hutt City Council. Greater Wellington manages the reach from the Whitemans Valley Road Culvert to the Pinehaven Reserve and Upper Hutt manages the reaches upstream from the reserve. Maintenance activities include removing obstacles from the channel (such as trees). Erosion repair is the responsibility of the landowner, although we are happy to provide advice on request.

Pinehaven Stream Flood Improvement Works

The Pinehaven Stream Flood Improvement Works, part of the Floodplain Management Plan, are starting soon. On behalf of Greater Wellington Regional Council and the Upper Hutt City Council, Wellington Water is managing the delivery of this project. Find out about updates on design, consenting and subsequent construction.

The Pinehaven Stream Floodplain Management Plan 

The Pinehaven Stream Floodplain Management Plan was endorsed by Council on 29 June 2016. You can download a copy of the plan below or alternatively summary posters prepared for consultation about the plan.

Proposed Pinehaven Stream Floodplain Management Plan Vol 1

Proposed Pinehaven Stream Floodplain Management Plan Vol 2

Pinehaven Stream Floodplain Management Plan Summary posters

The Pinehaven Flood Hazard

The map below shows the Pinehaven Stream catchment. To find out  more detailed information of flood hazards, find the sheet number near the area you are interested in on the map below and download the corresponding number from the menu on the right of this page.