Skip to content

Pinehaven Stream

http://www.gw.govt.nz/pinehavenstream

Pinehaven Stream

Updated 1 September 2017 3:50pm

The Pinehaven Stream is jointly administered by Greater Wellington Regional Council and Upper Hutt City Council. Greater Wellington manages the reach from the Whitemans Valley Road Culvert to the Pinehaven Reserve and Upper Hutt manages the reaches upstream from the reserve. Maintenance activities include removing obstacles from the channel (such as trees). Erosion repair is the responsibility of the landowner, although we are happy to provide advice on request.

The Pinehaven Stream Floodplain Management Plan 

The Pinehaven Stream Floodplain Management Plan was endorsed by Council on 29 June 2016. You can download a copy of the plan below or alternatively summary posters prepared for consultation about the plan.

Proposed Pinehaven Stream Floodplain Management Plan Vol 1

Proposed Pinehaven Stream Floodplain Management Plan Vol 2

Pinehaven Stream Floodplain Management Plan Summary posters

 

Considered options for flood risk management

Between 2010 and 2012 options for flood risk management were developed. These were further developed with the community between 2012 and 2014. The material showing a range of options for flood risk management released in 2012 is presented below.

Options for flood management presented at the 18th of July Openday held at the Pinehaven Community Hall can be downloaded below

Upper Catchment Options

Lower Catchment Options

 

The Pinehaven Flood Hazard

The map below shows the Pinehaven Stream catchment. To find out  more detailed information of flood hazards, find the sheet number near the area you are interested in on the map below and download the corresponding number from the menu on the right of this page.