Skip to content

Park notices - 2019

http://www.gw.govt.nz/kaitoke-park-notices-2019

Park notices - 2019

Updated 13 January 2020 10:23am

Swing bridge track closed at the flume bridge

Posted 13/1/20

The swing bridge track will be closed at the flume bridge from 13-15 Jan due to engineering works. You can still access the track but will have to return the same way as you came.

Water pump installation

Posted 31/10/19

Wellington Water will be installing emergency water pumps at Te Marua as part of their bulk water supply resilience programme.

This work will take place from 5 June to 30 November 2019 over the hours of 7:30am to 5pm. There will be times where there will be no vehicle access to the parking area of the river for health and safety reasons.

This means that if the water supply from Kaitoke Regional Park is unavailable, then we will still have access to water from these pumps. It allows the pumps in Kaitoke to have maintenance work and seismic upgrading done on them.