Skip to content

Document library

http://www.gw.govt.nz/document-library-2

Document library Western Corridor Planning Balance Sheet Assessment

Publication details back to Document library
Category
  • Regional transport > Western corridor
  • Title Western Corridor Planning Balance Sheet Assessment
    Document Download
    Date published 18 April 2005
    GWRC Publication No GW/TP-G-05/49
    Abstract One of the evaluation tools required to be applied in the
    assessment of options for the Western Corridor
    Transportation Study is a Planning Balance Sheet (PBS).

    A PBS establishes a framework of objectives and sub
    attributes and then scores and weights each item for each
    option. A PBS shows the trade offs between cost,
    performance and impact and can also be used for
    sensitivity testing.
    Related publications
    Title Published
    Western Corridor Transport Study - Summary of Draft Technical Report - Stage 1
    Read more
    18 April 2005
    Download
    Proposed Western Corridor Plan: Hearing Sub-committee's Report
    Read more
    8 March 2006
    Download
    Western Corridor Travel Demand Management
    Read more
    18 April 2005
    Download
    Western Corridor Confirmed Elements
    Read more
    18 April 2005
    Download
    Western Corridor Rail Issues and Options
    Read more
    18 April 2005
    Download
    Western Corridor Risk Assessment Workshop Report
    Read more
    8 April 2005
    Download
    Western Corridor Draft Technical Report - Stage 1 - Questions and Answers
    Read more
    18 April 2005
    Download
    Western Corridor Plan: Adopted 2012
    Read more
    1 September 2012
    Download