Rule 9B Diversion of groundwater

http://www.gw.govt.nz/Rule-9B-Diversion-of-groundwater

Rule 9B Diversion of groundwater

Updated 13 May 2015 12:38pm

[The diversion of groundwater is a permitted activity, provided that it complies with the conditions specified below.

Conditions

(1) There shall be no adverse effects on water supply other than for a temporary period during construction of no more than 24 hours.

(2) There shall be no flooding of land on any neighbouring property.

(3) There shall be no lowering of water levels in any river, lake, or wetland.

(4) There shall be no lowering of groundwater levels on any neighbouring property.]

Rule 9B was inserted by Decisions on Plan change 1 to the Regional Freshwater Plan December 2002